Forth Ports - Cement Unloader Slew ring/ lifting rams
Having ascertained that the slew ring on its 20 year-old cement unloader was in need of replacement, the
management of Forth Ports, Leith called in Metalock Engineering, Coventry, to machine the 3.28 metre diameter
slew ring surfaces to a high degree of flatness. This enabled a new slew ring to be fitted and restore the
unloader to efficient use.
Leith & Forth Ports contacted the original manufacturer, BMH, Sweden. to obtain the necessary spare parts and
also seek recommendations for a company to remachine the badly worn slew ring location faces to the necessary
flatness laid down by BMH. Based on past experience with similar work BMH recommended Metalock
Engineering.
Following a site meeting with Metalock to discuss the requirements, the Port engineering staff separated the
cabin and turret sections from the main frame enabling Metalock to undertake a series of pre-machining laser
inspections before setting up its purpose designed rotary facing machine. This comprises a hydraulically driven
arm that revolves around the slew ring base centre point. At the outer end is a hydraulically driven milling head.
The lower turret annular ring 3.28m diameter and 60mm wide was machined flat to within ±0.02mm and
subsequently checked by laser. A similar operation was performed on the upper turret slew ring location
surface which had been upturned on the dockside by the customer.
Metalock also in-situ machined three pairs of link bore locations used to locate the hydraulic lifting rams to
accept oversize pins manufactured and supplied by BMH. These assemblies had been dismantled and placed
on timbers on the dockside to facilitate the machining operations.
On completion of all the machining work, which was carried out within the time limitations and budget, Leith &
Forth Ports fitted the new slew ring and link bore location pins and re-assembled the unloader which has now
been back in service for several months and operating with no problems.
The 3.28m diameter upper and lower slew ring
faces were machined flat and three pairs of badly
worn link bore locations for the hydraulic lifting
rams were rebored to accept new oversize pins.